Our Projects
- Client Affholder / SAK & SHEA JV Duration1 year LocationAustin, Texas Project TypeDesign & Supply of Slipform Equipment, including management operations, technical & pre-construction provisions. Shaft […]
- ClientMedcem Duration62 Weeks LocationGladstone Docks, Liverpool, UK Project TypePrincipal Contractor – Design Management, Planning, Civil Engineering, Slipform Construction, M&E Coordination & Project Delivery. Project Value44,000 Tonnes […]
- Client Wykes EngineeringDuration 10 weeks LocationWymington Project Type5no reinforced concrete Silos for Anaerobic Digestion Plant, 4no 26m dia and 1no 12m dia, including RC bases for […]
- Client CIDON Duration8 weeks LocationDrax, Leeds Project Type2no Reinforced concrete Transformer buildings Wall length/thickness120 linear metres long each Pole with walls at 600mm thick Wall Height […]
- Client PJ Hegarty & Sons / JCD Group Duration10.5 Days LocationCork, Ireland Wall length/thickness60 linear metres / 400mm thickness Wall Height 85.5 metres At the end […]
- Client Kilnbridge Duration 9 months Location Canary Wharf, London E14 Project Type2no large Cores, 24 stories each, for Europe’s largest and most technologically advanced commercial health […]
- Client CIDON Duration Start Jan 2026, ongoing LocationNewcastle Project Type25no cores Wall length/thicknessCores ranging from 18 to 33 linear metres Wall Height Ranging from 13m to […]
- Client CIDON Duration 2 months Location Perth, Scotland Project Type Bunker for waste energy facility, design and built using slipforming system Wall length/thickness 90 linear meters, […]
- Client John Paul Construction Duration 5 months 2 weeks Location Dublin City center, Ireland Project Type2no Large Cores for high spec office building consisting of double […]
- Client Thomas Amstrong Duration 5 months 3 weeks Location Port of Workington Project Type2no 10m radius and 10000T capacity Cement Silos, all concrete elements included Wall […]
- Client Cidon Duration3 months Location Leeds Project Type6no Cores between 3 blocks on site for residential buildings of new large development along the river by LATIMER […]
- ClientStory Duration2 months LocationIrvine, Scotland Project TypeBunker for waste energy facility, design and built using slipforming system Wall length/thickness227 linear meters, wall thickness between 300 and […]
- ClientCVB JV Duration6.5 months LocationGreenwich London Project TypeDesign & delivery of a watertight secondary lining for the GREPS shaft, internal walls, Base slab and ‘benching’ Internal […]
- ClientGlenform Ltd Duration5 weeks LocationDublin Project TypeCommercial Wall Length191 linear meters Shaft Height42m Slipform Engineering provided our client, value engineering solutions, to meet their exacting requirements. […]
- ClientSpencer Group Duration16 Weeks LocationHull Project TypeCement Storage Wall Length44m Shaft Height53m Construction of a 14m diameter silo 53m high with internal silo slab at 8.5m […]
- ClientCidon Duration2 months LocationNorthwich Project Type3 sided bunker with Grab shaft and 20m high free standing columns Wall Length170 linear meters with wall thickness of 750mm […]
- ClientCVB JV Duration6 months LocationBermondsay London Project TypeDesign & delivery of a watertight secondary lining for the KEMPF shaft Internal Diameter20.5m Wall Length63 linear meters with […]
- ClientCVB JV Duration5 months LocationRotherhithe London Project TypeDesign & delivery of a watertight secondary lining for the Earl shaft Internal Diameter17.05m Wall Length54 linear meters with […]
- ClientCVB JV Duration4 months LocationDeptford London Project TypeDesign & delivery of a watertight secondary lining for the Deptford shaft Internal Diameter17.05m Wall Length54 linear meters with […]
- ClientMcRail Duration8 weeks LocationLondon Project TypeHigh Rise Core Wall Length50m Shaft Height53m Construct 53m high core with 4 lift shafts one stair well and fin walls […]
- ClientLynemouth Power Duration16 weeks LocationPort of Tyne Project TypeSlipform silo construction Wall Length46m Shaft Height37m Port of Tyne wood chip storage silos were constructed over an […]
- ClientCVB JV DurationOngoing LocationBermondsay London Project TypeDesign & delivery of a 25m diameter, 60m deep watertight secondary lining for the Chambers Wharf shaft Wall Length80 linear […]
- ClientLynemouth Power Duration11 days LocationPort of Tyne Project TypeSlipform silo construction Internal Diameter14m Height30m Port of Tyne rail load silo was constructed with a live train […]
- ClientKeltbray Duration6 months LocationGlasgow Project TypeLabour, Plant, Slipform, Equipment & Management Wall Length109m Core Height52m On this project we constructed 4 no. core for our client […]
- ClientDamac Duration5 months LocationGoole Project TypeSlipform Equipment and rig operator only Wall Diameter14m Core Height46m We undertook the site management, piling, foundations, staircase, hand railing and […]
- ClientABP Duration4 weeks LocationHull Project Type24/7 Slipform Working Diameter tolerance+- 10mm Height41m At the Port of Hull rail load silo we overcame a two week programme […]
- ClientDrax Duration7 days LocationSelby Project TypeSlipform silo construction Internal Diameter30m Height15m This project involved the construction of two slipform silos, both of 30m in diameter and […]