Lewisham
Client
McRail
Duration
8 weeks
Location
London
Project Type
High Rise Core
Wall Length
50m
Shaft Height
53m
Construct 53m high core with 4 lift shafts one stair well and fin walls that required temporary prop installation while sliding. There was a daily raise of 1 4m floor per day on this core due to the summer time construction.