    • Gladstone Docks, Liverpool
      ClientMedcem Duration62 Weeks LocationGladstone Docks, Liverpool, UK Project TypePrincipal Contractor – Design Management, Planning, Civil Engineering, Slipform Construction, M&E Coordination & Project Delivery. Project Value44,000 Tonnes […]
    • Wymington Digesters
      Client Wykes EngineeringDuration 10 weeks LocationWymington Project Type5no reinforced concrete Silos for Anaerobic Digestion Plant, 4no 26m dia and 1no 12m dia, including RC bases for […]
    • Port of Workington Silo
      Client Thomas Amstrong Duration 5 months 3 weeks Location Port of Workington Project Type2no 10m radius and 10000T capacity Cement Silos, all concrete elements included Wall […]
    • Damac Hull Silo Construction
      ClientSpencer Group Duration16 Weeks LocationHull Project TypeCement Storage Wall Length44m Shaft Height53m Construction of a 14m diameter silo 53m high with internal silo slab at 8.5m […]
    • Lynemouth Power Silo Construction
      ClientLynemouth Power​ Duration16 weeks LocationPort of Tyne Project TypeSlipform silo construction Wall Length46m Shaft Height37m Port of Tyne wood chip storage silos were constructed over an […]
    • Port of Tyne Biomass Silo Construction
      ClientLynemouth Power Duration11 days LocationPort of Tyne Project TypeSlipform silo construction Internal Diameter14m Height30m Port of Tyne rail load silo was constructed with a live train […]
    • Damac Cement Silo
      ClientDamac Duration5 months LocationGoole Project TypeSlipform Equipment and rig operator only Wall Diameter14m Core Height46m We undertook the site management, piling, foundations, staircase, hand railing and […]
    • Hull Biomass Silo Construction
      ClientABP Duration4 weeks LocationHull Project Type24/7 Slipform Working Diameter tolerance+- 10mm Height41m At the Port of Hull rail load silo we overcame a two week programme […]
    • Drax Power Station, Biomass Silo Construction
      ClientDrax Duration7 days LocationSelby Project TypeSlipform silo construction Internal Diameter30m Height15m This project involved the construction of two slipform silos, both of 30m in diameter and […]

    Contact us

    +442081 647602

    [email protected]

    Navigation

    • About
    • Projects
    • Videos
    • Offshore
    • Silos
    • News
    • Privacy Policy
    • Cookie Policy
    • Contact

    Copyright © 2026 Slipform Engineering. All Right Reserved. Website by Weborchard