- Client CIDON Duration8 weeks LocationDrax, Leeds Project Type2no Reinforced concrete Transformer buildings Wall length/thickness120 linear metres long each Pole with walls at 600mm thick Wall Height […]
- Client PJ Hegarty & Sons / JCD Group Duration10.5 Days LocationCork, Ireland Wall length/thickness60 linear metres / 400mm thickness Wall Height 85.5 metres At the end […]
- Client Kilnbridge Duration 9 months Location Canary Wharf, London E14 Project Type2no large Cores, 24 stories each, for Europe’s largest and most technologically advanced commercial health […]
- Client John Paul Construction Duration 5 months 2 weeks Location Dublin City center, Ireland Project Type2no Large Cores for high spec office building consisting of double […]
- Client Cidon Duration3 months Location Leeds Project Type6no Cores between 3 blocks on site for residential buildings of new large development along the river by LATIMER […]
- ClientGlenform Ltd Duration5 weeks LocationDublin Project TypeCommercial Wall Length191 linear meters Shaft Height42m Slipform Engineering provided our client, value engineering solutions, to meet their exacting requirements. […]
- ClientMcRail Duration8 weeks LocationLondon Project TypeHigh Rise Core Wall Length50m Shaft Height53m Construct 53m high core with 4 lift shafts one stair well and fin walls […]
- ClientKeltbray Duration6 months LocationGlasgow Project TypeLabour, Plant, Slipform, Equipment & Management Wall Length109m Core Height52m On this project we constructed 4 no. core for our client […]