Client
Kilnbridge
Duration
9 months
Location
Canary Wharf, London E14
Project Type
2no large Cores, 24 stories each, for Europe’s largest and most technologically advanced commercial health and life science building
Wall length/thickness
295 linear metres in total for both cores/wall thickness ranging from 200mm to 400mm
Wall Height
130.5m





Slipform Engineering provided our client 2no High rise cores including all temporary works required for various elements starting and finishing at certain heights.
Project completed ahead of construction programme with high quality standards maintained throughout and perfect H&S. It involved a lot of pre construction phase coordination between SEL and clients design team due to complex rebar detailing and core stability. Concrete mixes had to be adjusted for the different times of the year, for extremely cold and hot weather. Large amount of Slipform formwork were pre-built off site and delivered as required to accelerate site programme.
Over 10000 cubic m of concrete was poured , more than 2000T of rebar and 14000 couplers were fixed