- Client Affholder / SAK & SHEA JV Duration1 year LocationAustin, Texas Project TypeDesign & Supply of Slipform Equipment, including management operations, technical & pre-construction provisions. Shaft […]
- Client CIDON Duration Start Jan 2026, ongoing LocationNewcastle Project Type25no cores Wall length/thicknessCores ranging from 18 to 33 linear metres Wall Height Ranging from 13m to […]
- ClientCVB JV Duration6.5 months LocationGreenwich London Project TypeDesign & delivery of a watertight secondary lining for the GREPS shaft, internal walls, Base slab and ‘benching’ Internal […]
- ClientCVB JV Duration6 months LocationBermondsay London Project TypeDesign & delivery of a watertight secondary lining for the KEMPF shaft Internal Diameter20.5m Wall Length63 linear meters with […]
- ClientCVB JV Duration5 months LocationRotherhithe London Project TypeDesign & delivery of a watertight secondary lining for the Earl shaft Internal Diameter17.05m Wall Length54 linear meters with […]
- ClientCVB JV Duration4 months LocationDeptford London Project TypeDesign & delivery of a watertight secondary lining for the Deptford shaft Internal Diameter17.05m Wall Length54 linear meters with […]
- ClientCVB JV DurationOngoing LocationBermondsay London Project TypeDesign & delivery of a 25m diameter, 60m deep watertight secondary lining for the Chambers Wharf shaft Wall Length80 linear […]