by Matt Mallory | Aug 9, 2022
One Le Pol ClientGlenform Ltd Duration5 weeks LocationDublin Project TypeCommercial Wall Length191 linear meters Shaft Height42m Slipform Engineering provided our client, value engineering solutions, to meet their exacting requirements. This was achieved through close...
by Matt Mallory | Aug 9, 2022
Lewisham ClientMcRail Duration8 weeks LocationLondon Project TypeHigh Rise Core Wall Length50m Shaft Height53m Construct 53m high core with 4 lift shafts one stair well and fin walls that required temporary prop installation while sliding. There was a daily raise of 1...
by Matt Mallory | Aug 8, 2022
Buchanan Wharf ClientKeltbray Duration6 months LocationGlasgow Project TypeLabour, Plant, Slipform, Equipment & Management Wall Length109m Core Height52m On this project we constructed 4 no. core for our client Keltbray Structures. On each core we installed 10 QTY...
by Matt Mallory | Aug 8, 2022
Parliament Street ClientGoodwin Construction Group Duration5 weeks LocationLiverpool Project TypeSlipform equipment and rig operator only Wall Length35m Height37m We provided the equipment hire and rig operator on this scheme, for ease of construction we designed all...
by Matt Mallory | Aug 8, 2022
Stanhope House ClientT Vaughan Ltd Duration7 weeks with 10 weeks of hold points LocationPortsmouth Project TypeFully inclusive labour, plant & slipform equipment including all management Wall Length40m Core Height61m On this scheme we provided our fully inclusive...