Damac Hull

Damac Hull

Damac Hull Silo Construction ClientSpencer Group Duration16 Weeks LocationHull Project TypeCement Storage Wall Length44m Shaft Height53m Construction of a 14m diameter silo 53m high with internal silo slab at 8.5m high with sloping internal floor for air slides....
Lynemouth Power

Lynemouth Power

Lynemouth Power Silo Construction ClientLynemouth Power​ Duration16 weeks LocationPort of Tyne Project TypeSlipform silo construction Wall Length46m Shaft Height37m Port of Tyne wood chip storage silos were constructed over an 11 week period from Commencement of...
Port of Tyne Biomass

Port of Tyne Biomass

Port of Tyne Biomass Silo Construction ClientLynemouth Power Duration11 days LocationPort of Tyne Project TypeSlipform silo construction Internal Diameter14m Height30m Port of Tyne rail load silo was constructed with a live train track within 5m of the base of the...
Damac Goole

Damac Goole

Damac Cement Silo ClientDamac Duration5 months LocationGoole Project TypeSlipform Equipment and rig operator only Wall Diameter14m Core Height46m We undertook the site management, piling, foundations, staircase, hand railing and roofing works on the site, all the way...
ABP Hull Biomass

ABP Hull Biomass

Hull Biomass Silo Construction ClientABP Duration4 weeks LocationHull Project Type24/7 Slipform Working Diameter tolerance+- 10mm Height41m At the Port of Hull rail load silo we overcame a two week programme delay, in our 4 week contract programme. This left us with...