by Matt Mallory | Oct 11, 2022
Greenwich Pumping Station ClientCVB JV Duration6.5 months LocationGreenwich London Project TypeDesign & delivery of a watertight secondary lining for the GREPS shaft, internal walls, Base slab and ‘benching’ Internal Shaft Diameter17.050m Lining wall Length53.5...
by Matt Mallory | Aug 9, 2022
KEMPF – Thames Tideway ClientCVB JV Duration 6 months LocationBermondsay London Project TypeDesign & delivery of a watertight secondary lining for the KEMPF shaftInternal Diameter 20.5m Wall Length63 linear meters with varying wall thickness of 850mm to 3m...
by Matt Mallory | Aug 9, 2022
Earl Pumping Station ClientCVB JV Duration5 months LocationRotherhithe London Project TypeDesign & delivery of a watertight secondary lining for the Earl shaftInternal Diameter 17.05m Wall Length54 linear meters with varying wall thickness of 650mm to 3.5m Shaft...
by Matt Mallory | Aug 9, 2022
Deptford Church Street – Thames Tideway ClientCVB JV Duration4 months LocationDeptford London Project TypeDesign & delivery of a watertight secondary lining for the Deptford shaft Internal Diameter 17.05m Wall Length54 linear meters with thickness of 650mm...
by Matt Mallory | Aug 8, 2022
Thames Tideway Secondary Lining (Chambers Wharf) ClientCVB JV DurationOngoing LocationBermondsay London Project TypeDesign & delivery of a 25m diameter, 60m deep watertight secondary lining for the Chambers Wharf shaft Wall Length80 linear metres with varying wall...