Parliament Street

Client
Goodwin Construction Group

Duration
5 weeks

Location
Liverpool

Project Type
Slipform equipment and rig operator only

Wall Length
35m

Height
37m

We provided the equipment hire and rig operator on this scheme, for ease of construction we designed all our yoke legs to avoid any clashes with the door openings. This made it more efficient for the contractor to install the door frames as they can be installed earlier due to no cross bars being in the way. This was also good for the slipform system as we had all our jack rods cast in concrete and did not require the contractor to install bracing to our tubes. There was 3 lift shafts and 1 stairwell within this rig which was constructed at a rate of over 3m per day